The mass is positioned towards the Eilandbrug. This image is enhanced with a large cantilevered balcony. From the offices there is a panoramic view of the IJsseldelta, which is bordered all around by this cantilever. This frame makes the landscape look like a living painting. The offices are accessible from a central hall/entrance. This also literally forms as a gate upon entry. With a view of a void along which the office spaces are positioned. The assembly hall embraces the Metadecor office mass. This creates a strong and recognizable silhouette. The building is also equipped with various sustainable installations.
Project PVO75 | Client Metadecor | Location Business park RW50 Kampen | Gross floor area 800 m2 BVO | Start Design June 2015 | Start Construction end 2017 | Completion
2018